Design, Fabrication, Galvanization, Supply & Installation of GSM Mobile Telecom Towers in Lahore Area
|
PMCL / MOBILINK
|
2004 |
|
Fabrication, Galvanization and installation of 150' Booster Tower at Dasu of Pakistan Television Corporation, Islamabad.
|
PTV
|
2004 |
|
Engineering Services for "INTELLIGENT NETWORK" Project of PTCL as joint venture partner of Huawei Technologies.
|
HUAWEI TECHNOLOGIES (China) / PTCL.
|
2003 |
|
Design, Fabrication, Galvanization / Supply & Installation of Steel Tower with associated infrastructure of Mobilink GSM Mobile Telecommunication Network.
|
MOBILINK
|
2002 |
|
GSM 900 Mobile Communication Network Project of PTML.
|
NORTE L NETWORKS (Canada) Pakistan Telecom Mobile LTD
|
2001 |
|
Design, Fabrication, Galvanization / Supply & Installation of Steel Tower with associated infrastructure of UFONE GSM Mobile Telecommunication Project Phase-I.
|
PTML/NORTEL
|
2000 |
|
GSM Mobile Communication Network Project of AT&T in Saudi Arabia
|
ABV / AT&T (LUCENT) Saudi Arabia
|
1998 |
|
70,000 Digital Telephone Lines network Out Side Plant (OSP) of Greater Colombo Telecommunication Network Improvement Project of SIRILANKA TELECOM.
|
SUMITOMO CORPORATION (JAPAN) / SIRILANKA TELECOM
|
1996 |
|
30,000 Digital Telephone Lines network Out Side Plant (OSP) of BLT project.
|
SUMITOMO CORPORATION (JAPAN) / PTCL
|
1995 |
|
Optic Fibre Transmission Cable installation between various exchanges of PTCL for BLT Project of digital telephone networks.
|
SUMITOMO CORPORATION (JAPAN) / PTCL
|
1995 |
|
Optic Fibre Cable Works for Defence Communication of Pakistan Army's National Logistic Cell (NLC) connecting their exchanges with optic fiber transmission system of PTC in various cities of Pakistan.
|
TELECOM AUSTRALIA/TELSTRA /NLC
|
1994 |
|
Optic Fibre Cable(1200 KM) Transmission system between Karachi and Rawalpindi of Pakistan Telecom Corporation.
|
TELECOM AUSTRALIA/OLEX /PTCL
|
1992 |
|